Machine Control Models & Earthwork Takeoffs in Wyoming

Wyoming jobs are spread thin across a big state: Cheyenne and Laramie on I-80, Casper on I-25, Gillette and Sheridan up north, Rock Springs and Evanston out west. TCL Consulting builds earthwork takeoffs, 3D machine control models and remote GPS support for contractors in all of them. The work is done in Nebraska and delivered to you electronically, so a pad outside Pinedale costs the same to serve as one in Cheyenne.

Quantities for High Plains Wind, Frost and Bentonite

Wyoming dirt swings from sandy high plains to bentonite clay that turns to grease when wet, with rock never far below and a frost depth that changes how deep the utilities go. Those details move yardage. We read your plans and CAD for conflicts first, then build cut and fill, material and haul quantities so a Casper commercial site or a Cheyenne warehouse pad is bid on what the ground will actually do.

Machine Control Models for Energy Pads, Data Centers and WYDOT

Well pads and access roads in the Powder River Basin, wind farm sites along I-80 near Rawlins, data center campuses on the edge of Cheyenne, WYDOT grading at altitude: Wyoming work is big, remote and windy. We build finish grade, subgrade, over-excavation and phased surfaces from the design CAD and export them for the machine control platforms your fleet runs. Your crew handles localization and verifies the surface before cutting.

Remote GPS Help, One Hour Behind Central

A crew outside Gillette with a surface that will not load cannot wait a day for a drive out. We connect remotely, look at the data and the receiver setup, and fix what is in the files. Hours are Monday through Friday, 7 to 5 Central, which is 6 to 4 Mountain time in Wyoming. Saturdays we answer 7 to noon Central. No site visits, and field verification stays with your crew.

"A split-screen image showcasing construction machine control technology: on the left, a bulldozer leveling soil at a construction site under a clear sky; in the center, a digital display showing real-time 3D terrain data for machine control; on the right, an excavator performing precise grading work in a similar outdoor setting."

Why Wyoming Contractors Work With TCL

Based in Nebraska, in the civil industry since 2013

Surfaces exported for the GPS systems your crew already runs

Document review on every job before building starts

Files that have run on projects in 42 of 50 states

Contact Us

Working dirt in Wyoming? Send the plans and CAD, whether it is a Cheyenne pad or a Powder River Basin access road, and you get a price back plus any questions the documents raise. Call (402) 708-1577 during Central hours or use the form below.

Common Questions

A takeoff normally goes out within a few business days once a complete plan set is in hand and the document review is finished. For a bid in Casper or Cheyenne that closes sooner, a rush of 48 hours or less is available and adds 20% to the flat rate. The clock starts when all the files arrive, so one complete send beats three partial ones. If the plans raise questions, they go back to you the same day so nothing sits waiting on an answer.

Yes, as long as the crew can get a signal at some point in the day. Delivery is remote, so a pad south of Gillette or a wind site near Medicine Bow gets the same files and the same turnaround as a job inside Cheyenne city limits. Nobody from TCL drives to the site. Your crew runs the base, handles localization to the project control and checks the surface in the field before cutting. We handle the quantities, the surfaces and the fixes when the data is wrong.

A takeoff can start from a complete PDF plan set, and CAD makes it tighter. A 3D machine control model cannot be built from PDF alone. Send the current design CAD, existing ground, alignments and profiles, and the control points or coordinate system the project is on. Every job starts with a document review for plan conflicts and missing information. On Wyoming energy pads that review often catches a drainage sheet that does not match the pad grading, and that goes to the engineer before building begins.

Revisions are routine and priced as routine. Send the revised sheets or CAD, note what changed if you know, and the model or takeoff gets updated against the current set with the changes called out so the operator loads the right file. Pad layouts in the Powder River Basin shift when the well plan changes, and the surface has to follow. Minor revisions turn quickly. A redesign that changes the grading concept is quoted before work starts.

Takeoffs run on four flat tiers by site size: $249 up to 1 acre, $499 for 1 to 10 acres, $895 for 10 to 20 acres, and $1,349 for 20 acres and up or heavy civil. Rush turnaround, 48 hours or less, adds 20% to that rate. Machine control models are priced by the acre in the calculator on the pricing page; enter the acres and the number comes up. 2D linework is $495 flat. Storm, utility, highway and specialty scopes, including long WYDOT grading runs on I-80, are quoted before production starts.