Machine Control Models & Earthwork Takeoffs in Washington
Washington grading splits at the Cascades — glacial till, wet-season limits, and steep infill around Seattle and Tacoma; open basalt ground out toward Spokane and the Tri-Cities. TCL Consulting equips Washington contractors with earthwork takeoffs, 3D machine control models, and remote GPS support, delivered remotely on both sides of the mountains.
Takeoffs That Hold Up on Washington Projects
Till, tightline, and retaining walls make west-side quantities unforgiving, and east-side rock has no patience for guesswork either. We build cut/fill maps, material totals, and haul numbers from your plans and CAD — with the documents read for conflicts as part of the job.
Machine Control Surfaces for Washington Dirt Crews
An I-5 corridor warehouse pad, a Vancouver subdivision phase, an industrial site outside Spokane — we turn design data into finish grade, subgrade, and phased surfaces your operators can run, checked before delivery.
GPS Help Without the Site Visit
When a file fails in Everett or a rover won't localize in Yakima, remote support means the fix starts now. We take over the data problem and get the machine holding grade again.

Our Services & Solutions
Machine Control Models
Our precise 3D models guide GPS-equipped machinery, ensuring accurate grading and material placement. Adaptable for complex projects, our models minimize errors and streamline the construction process.
Material & Earthwork Takeoffs
Get accurate material estimates to avoid costly overages or shortages. Our detailed takeoffs ensure that you know exactly what’s needed for every phase of your project.
Remote GPS Support
When downtime isn’t an option, our nationwide remote GPS support keeps your crews moving, your machines accurate, and your projects on track with fast, reliable service anywhere you work.
What Washington Contractors Get From TCL
Quantities worked up from the actual plans, not square-foot guesses
GPS-ready models for dozers, blades, and excavators
Files that have run on projects in 42 of 50 states
No middleman — you talk to the person building your file
Contact UsLining up work in Washington? Send the plans and CAD data and you'll get a price plus any questions the documents raise. Call (402) 708-1577 or use the form below.
Common Questions
What do you need from us to start a Washington takeoff?
Site plans, grading sheets, and the engineering drawings get a takeoff moving. For machine control models we need current CAD or surface data, alignments, and control — a PDF alone is not enough to build a model your machines can trust. Every job also starts with a document review that flags conflicts and missing information before building begins, so problems surface on paper instead of in glacial till and wet-season limits.
What happens when the engineer revises the plans?
Revisions are part of dirt work — when the engineer reissues, the takeoff or model gets updated to match. If the change is big enough to move the timeline or cost, you hear about it before anything happens, never after.
How much should we budget for a takeoff in Washington?
Takeoff pricing is flat-rate by site size: $249 up to an acre, $499 from 1–10 acres, $895 from 10–20, and $1,349 for 20-plus. The rate is the same whether the site sits in Seattle or out along Spokane and the Tri-Cities east of the mountains. Machine control model pricing runs through the calculator on our pricing page — enter the acreage and you have your number. Larger or unusually complex sites are always quoted before any work starts.
How long does a machine control model take for a Washington job?
Simple sites usually turn around in a couple of days; intricate ones can run up to a week, and your proposal states the exact timeline before work starts. When a Washington letting is breathing down your neck, rush delivery inside 48 hours is available for 20% on top.
Do we ever need you on-site in Washington?
There is no site visit — files, models, and support are all delivered remotely to Washington crews from Seattle to Tacoma. Stuck-on-grade calls are handled the same way, through the data. The contractor stays responsible for field control, localization, and verification before the model runs a machine.
