Opens in a new tab

Bringing Accuracy To Every Estimate.

Machine Control Models & Earthwork Takeoffs in Minnesota

Minnesota crews grade around frost, wetlands, and a construction season that refuses to stretch — most of it packed into the Twin Cities metro, with Rochester and Duluth pulling their share. TCL Consulting provides Minnesota contractors with earthwork takeoffs, 3D machine control models, and remote GPS support, delivered remotely.

Takeoffs That Hold Up on Minnesota Projects

Glacial soils, organic pockets, and wetland setbacks complicate every balance. We build cut/fill maps, material totals, and haul numbers from your plans and CAD — and read the documents for conflicts while we're at it, before the short season eats the float.

Machine Control Surfaces for Minnesota Dirt Crews

A warehouse pad in Shakopee, subdivision phases in the north metro, a Rochester commercial site — we turn design data into finish grade, subgrade, and phased surfaces your operators can run, checked before delivery.

GPS Help Without the Site Visit

When a file misbehaves in St. Cloud or Mankato, the season doesn't pause. We remote in, fix data and localization problems, and get the machine back on grade the same day the problem shows up.

Scrapers and a dozer stripping a cleared dirt site

Our Services & Solutions

What Minnesota Contractors Get From TCL

Quantities worked up from the actual plans, not square-foot guesses

GPS-ready models for dozers, blades, and excavators

Files that have run on projects in 42 of 50 states

No middleman — you talk to the person building your file

Contact Us

Lining up Minnesota work? Send the plans and CAD data and you'll get a price plus any questions the documents raise. Call (402) 708-1577 or use the form below.

Common Questions

There is no site visit — files, models, and support are all delivered remotely to Minnesota crews from the Twin Cities to Rochester. Stuck-on-grade calls are handled the same way, through the data. The contractor stays responsible for field control, localization, and verification before the model runs a machine.

Site plans, grading sheets, and the engineering drawings get a takeoff moving. For machine control models we need current CAD or surface data, alignments, and control — a PDF alone is not enough to build a model your machines can trust. Every job also starts with a document review that flags conflicts and missing information before building begins, so problems surface on paper instead of in frost, wetlands, and a short season.

Revisions are part of dirt work — when the engineer reissues, the takeoff or model gets updated to match. If the change is big enough to move the timeline or cost, you hear about it before anything happens, never after.

Flat rates, published up front: up to 1 acre is $249, 1–10 acres $499, 10–20 acres $895, and 20+ acres $1,349. A pad in Rochester prices the same as one anywhere else in Minnesota. For machine control models, the pricing-page calculator gives an instant per-acre figure, and anything oversized or unusual gets a firm quote first.

Simple sites usually turn around in a couple of days; intricate ones can run up to a week, and your proposal states the exact timeline before work starts. When a Minnesota letting is breathing down your neck, rush delivery inside 48 hours is available for 20% on top.