Opens in a new tab

Bringing Accuracy To Every Estimate.

Machine Control Models & Earthwork Takeoffs in Massachusetts

Massachusetts sites are small, regulated, and full of ledge — and the schedule pressure from Boston out through the I-495 belt never lets up. TCL Consulting provides Massachusetts contractors with earthwork takeoffs, 3D machine control models, and remote GPS support, delivered remotely.

Takeoffs That Hold Up on Massachusetts Projects

When a Worcester site pairs ledge with a tight lot line, quantity errors have nowhere to hide. We work up cut/fill maps, material totals, and haul numbers from your plans and CAD, reading the documents for conflicts along the way.

Machine Control Surfaces for Massachusetts Dirt Crews

Lab campuses, warehouse pads off the Pike, subdivision phases in the South Shore — we build finish grade, subgrade, and phased surfaces that match the design and load clean on your grade-control gear.

GPS Help Without the Site Visit

A machine idling in Springfield waits on nobody once support goes remote. We connect, fix file and localization problems, and hand the crew back a working setup — usually within the same shift.

Orange excavator digging into a sandy slope

Our Services & Solutions

What Massachusetts Contractors Get From TCL

Cut/fill maps and quantities that hold up in bid reviews

GPS-ready models for dozers, blades, and excavators

Files that have run on projects in 42 of 50 states

No middleman — you talk to the person building your file

Contact Us

Bidding Massachusetts work? Send the plans and CAD data and you'll get a price plus any questions the documents raise. Call (402) 708-1577 or use the form below.

Common Questions

Takeoff pricing is flat-rate by site size: $249 up to an acre, $499 from 1–10 acres, $895 from 10–20, and $1,349 for 20-plus. The rate is the same whether the site sits in Boston or out along the South Shore and central Mass. Machine control model pricing runs through the calculator on our pricing page — enter the acreage and you have your number. Larger or unusually complex sites are always quoted before any work starts.

Expect a couple of days on simpler work and up to a week on intricate sites; the proposal pins the date so you can plan the bid. If the schedule is tight, sub-48-hour rush turnaround is available at a 20% premium.

There is no site visit — files, models, and support are all delivered remotely to Massachusetts crews from Boston to the I-495 belt. Stuck-on-grade calls are handled the same way, through the data. The contractor stays responsible for field control, localization, and verification before the model runs a machine.

Send the plans, the grading information, and any CAD the engineer will release — for models, current surface data, alignments, and control are required, because a PDF by itself will not produce a reliable machine file. Before anything is built we read the full set and send back the questions it raises; on Massachusetts sites that review has a way of paying for itself.

Revisions are part of dirt work — when the engineer reissues, the takeoff or model gets updated to match. If the change is big enough to move the timeline or cost, you hear about it before anything happens, never after.