Opens in a new tab

Machine Control Models & Earthwork Takeoffs in Hawaii

TCL Consulting builds earthwork takeoffs and 3D machine control models in Papillion, Nebraska, and delivers them to Hawaii contractors over the internet. An ocean between us changes nothing about the file. Site crews in Kapolei, Kahului and Kailua-Kona upload plans and CAD, get a document review back, then get surfaces and quantities built for the ground they are actually on. Nobody flies in, nothing ships, and the work shows up ready to load.

Takeoffs for Lava Rock, Coral Fill and Red Dirt

Hawaii grading is the easiest dirt in the country to estimate wrong. Blue rock and lava on the Big Island, coral and limestone on the Ewa Plain, red volcanic clay through central Oahu and upcountry Maui, each one moves at a different cost. Our takeoffs break out rock, common excavation, fill and strip on their own lines so your bid carries the ripping and hauling the island actually requires.

Models for Military, Resort and Subdivision Work

Hawaii work means base projects on Oahu, resort grading in Ko Olina and Wailea, subdivisions around Kapolei and highway work on the H-1 and the Queen Kaahumanu corridor in Kona. We take the engineer's CAD and build finish grade, subgrade, over-excavation and pavement surfaces, plus utility linework, in the format your machine control platform reads. Every surface gets checked against the plans before it goes out, because a bad file costs more an ocean away.

Remote GPS Support, Starting Before Hawaii's Sunrise

Our hours are Monday through Friday, 9 to 5 Central. In Hawaii that is 4 AM to noon in summer and 5 AM to 1 PM in winter, since Hawaii skips daylight saving time. Call when the crew rolls out and a file or localization problem gets worked before midmorning. No site visits. Your crew holds control and localization, we hold the file.

"A split-screen image showcasing construction machine control technology: on the left, a bulldozer leveling soil at a construction site under a clear sky; in the center, a digital display showing real-time 3D terrain data for machine control; on the right, an excavator performing precise grading work in a similar outdoor setting."

Our Services & Solutions

Why Hawaii Contractors Work With TCL

Papillion, Nebraska based, in the civil industry since 2013

Rock, coral and common excavation counted as separate lines

A document review before every build, included in the price

Files that have run on projects in 42 of 50 states

Contact Us

Working dirt in Hawaii? Send the plans and CAD and we come back with a price and any questions the documents raise, so the gaps surface before the first load of rock. Call (402) 708-1577 or use the form below.

Common Questions

The time difference costs you nothing on turnaround, because the building happens on our clock while you sleep and the files are waiting when you open the office. We give a delivery date when we quote, after the document review. If a bid in Honolulu is due sooner than that date allows, rush delivery in 48 hours or less is available and adds 20% to the price. Mention the due date in Hawaii time when you send the files and we count back from it.

It works the same as it does across a county line. You upload plans and CAD, we build in Nebraska, and the takeoff or model downloads to your office in Hilo or your tablet on a pad in Kapolei. Nothing physical ships, so there is no barge schedule to wait on. What stays on the island is the field side: your crew sets control, localizes the GPS system to the site and checks the surface against known points before cutting. We do not travel to Hawaii for site visits or field support, and we say that plainly.

A takeoff, usually yes. A 3D machine control model, no; PDF sheets drop the elevations and geometry a dozer needs, so we need the engineer’s CAD or surface, alignments for any roadway and the control points from your surveyor. Every job starts with a full read of the package and a list of what is missing or in conflict. On Hawaii plans that review tends to catch rock excavation limits that the geotech report mentions and the grading plan ignores, or a pavement section that changes between sheets. Those questions go to you before we build anything.

We revise the model, and we bill it as routine work because that is what it is. Send the new sheets or CAD and a note on what changed, we compare them against the surface your operators are running, rebuild the affected areas and send a plain summary of where grade moved. Military and state highway work in Hawaii revises often during construction, so every job’s source files stay organized and ready, and a revision normally turns faster than the original build did.

The same as everywhere else; there is no island surcharge because nothing ships. Takeoffs are flat rate by site size: $249 up to 1 acre, $499 for 1-10 acres, $895 for 10-20 acres, and $1,349 for 20 acres and up or heavy civil. Machine control models are priced by the acre in the calculator on our pricing page. 2D linework is $495 flat. Storm, utility, highway and specialty scopes, including most base and harbor work, are quoted before production. No discounts and no volume deals; one price list for every contractor.